Hoppa till innehåll
VG Transport
Tailored transport solutions for virtually every freight need – domestic and international.28 countries: mainland EU, Norway, the UK and Switzerland.

Road transport & forwarding – to and from Spain

Freight Portugal Spain

PTPortugalESSpain

The Iberian corridor is one of our highest-capacity lanes. Full trailers move between Portugal and Spain in both directions – semi-mega tautliners loading up to 2.90 m, with box and refrigerated equipment for the goods that need it.

Transit time
1–2 days
Capacity
Daily capacity
Customs
None – within EU
Hubs
5+ cities

PortugalSpain

How we run to Spain

  • Full loads (FTL) with daily capacity, both directions
  • Semi-mega tautliners load up to 2.90 m high
  • Box trailers for high-value goods, reefers for temperature-controlled
  • No customs within the EU – goods roll without stopping

Customs

Portugal and Spain are both within the EU customs union, so your freight moves freely without clearance – just a consignment note and packing list.

Get a quote: PortugalSpain

Send us your needs and we'll come back with a proposal – often within 5 minutes during working hours.

Free and with no obligation. The form is the fastest way to reach us – your request goes straight to the right person, with what we need to work out a price. Usually a reply within 5 minutes during working hours.

We deliver to all of Spain

Common destinations on this lane – but of course we reach every town, even smaller ones.

MadridBarcelonaValenciaZaragozaBilbao

Common questions

Freight to Spain

How long does transport between Portugal and Spain take?+

Madrid is typically reached within a day of loading in Lisbon or Porto; Barcelona and the east coast in 1–2 days.

Can you carry temperature-controlled goods on this lane?+

Yes – refrigerated trailers run the corridor alongside tautliners and box trailers. Tell us the temperature range and we'll set it up.

Do you take part loads as well as full trailers?+

Yes, both. Full loads give the best rate per pallet, but groupage runs the corridor too.